Timescapes of Himalayan hydropower: Promises, project life cycles, and precarities
Austin Lord, Georgina Drew, Mabel Denzin Gergan
Cornell University The University of Adelaide Vanderbilt University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
In this paper, we review the existing social science scholarship focused on hydropower development in the Himalayan region, using an interpretive lens attuned to issues of time and temporality. While the spatial politics of Himalayan hydropower are well examined in the literature, an explicit examination of temporal politics is lacking. In this paper, we present a conceptual framework organized around the heuristic of timescapes, highlighting temporal themes implicit in the existing literature. In three sections, we explore the temporal politics of anticipation that shape hydropower dreams, the intersecting temporalities and rhythms that modulate the life cycles of hydropower projects, and the ways that geological and hydrological time affect both hydropower development and broader Himalayan futures. Along the way, we pose a series of questions useful for framing future research given the significant climatic, geophysical, and sociopolitical changes underway in the Himalayan bioregion, calling for greater analytical attention to time, temporality, and temporal ethics in future studies of hydropower in the Himalayas and beyond. This article is categorized under: Engineering Water > Planning Water Human Water > Water Governance Human Water > Water as Imagined and Represented Science of Water > Water and Environmental Change
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
社会科学Hydropower, Displacement, Environmental Impact
Water Governance and Infrastructure · Transboundary Water Resource Management
参考文献 140
此处列出前 3 条
引用本文 38
按被引量排序,此处列出前 3 条