Optimizing MEP design in early AEC projects through generative design
Edgar Pestana, Andrew Paice, Shaun West
Basler & Hofmann (Switzerland) Lucerne University of Applied Sciences and Arts
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The digital transformation of the AEC industry through BIM has improved productivity during detailed design and construction planning phases. Early design choices influence a project's success but have yet to benefit from BIM-based approaches. This paper investigates the feasibility and acceptance of employing Generative Design (GD) to optimize early Mechanical, Electrical, and Plumbing (MEP) designs in residential real estate for space efficiency. Interviews indicate the main issue is acceptance due to the belief that a GD approach needs to be more robust. BIM is integrated with GD, utilizing the architectural layout (IFC) as input to generate design variants tailored to minimize technical space while ensuring installation feasibility. Robustness is assessed via Monte Carlo Simulation , revealing an estimated success rate of 99% (81% with 95% confidence). These results quantify the robustness of the approach, paving the way to broader acceptance of GD in the early phases of AEC projects.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIAdvanced Multi-Objective Optimization Algorithms
Probabilistic and Robust Engineering Design · Topology Optimization in Engineering
参考文献 25
此处列出前 3 条
引用本文 14
按被引量排序,此处列出前 3 条