Automated construction scheduling using deep reinforcement learning with valid action sampling
Yuan Yao, Vivian W.Y. Tam, Jun Wang, Khoa N. Le, Anthony Butera
Western Sydney University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The growing demand for buildings and infrastructures requires optimal construction schedules under real-world complexities. This paper presents an automated scheduling optimization method for large construction projects, considering real-world constraints and the need for rescheduling. A Deep Reinforcement Learning (DRL) model with a Valid Action Sampling (VAS) mechanism is proposed to optimize schedules. The method integrates a Graph Convolutional Network (GCN) for feature extraction and includes a reward shaping mechanism to expedite convergence. The proposed method outperforms traditional methods with reduced project duration and runtime in both scheduling and rescheduling cases. This advancement benefits construction managers seeking efficient and flexible project management. The findings inspire future research into broader and more practical construction scheduling solutions utilizing DRL.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIConstruction Project Management and Performance
BIM and Construction Integration · Resource-Constrained Project Scheduling
参考文献 48
此处列出前 3 条
引用本文 47
按被引量排序,此处列出前 3 条