Industrial-size job shop scheduling with constraint programming
Giacomo Da Col, Erich Teppan
Fraunhofer Austria University of Klagenfurt
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The job shop scheduling problem is one of the most studied optimization problems to this day and it becomes more and more important in the light of the fourth industrial revolution (Industry 4.0) that aims at fully automated production processes. For a long time exact methods like constraint programming had problems to solve real large-scale problem instances and methods of choice were to be found in the area of (meta-) heuristics. However, developments during the last decade improved the performance of state-of-the-art constraint solvers dramatically, to the point that they can be applied also on large-scale instances. The presented work’s main target is to elaborate the performance of state-of-the-art constraint solvers with respect to industrial-size job shop scheduling problem instances. To this end, we analyze and compare the performance of two cutting-edge constraint solvers: OR-Tools, an open-source solver developed by Google and recurrent winner of the MiniZinc Challenge, and CP Optimizer, a proprietary constraint solver from IBM targeted at industrial optimization problems. In order to reflect real-world industrial scenarios with heavy workloads like found in the semi-conductor domain, we use novel benchmarks that comprise up to one million operations to be scheduled on up to one thousand machines. The comparison is based on the best makespan (i.e. completion time) achieved and the time required to solve the problem instances. We test the solvers on single-core and quad-core configurations.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Scheduling and Optimization Algorithms
Assembly Line Balancing Optimization · Constraint Satisfaction and Optimization
参考文献 100
此处列出前 3 条
引用本文 56
按被引量排序,此处列出前 3 条