Multi-objective Optimization of Construction Project Time-Cost-Carbon Emission Based on BIM Technology
Minjing Wang, Yifan Ding, Huan Zheng
Chongqing Technology and Business University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
In the construction process, a large number of resources are consumed in a short period, leading to high intensity and concentration of carbon emissions. From the perspective of China’s Double Carbon Policy, a multiobjective optimization problem integrating BIM technology and intelligent optimization algorithm is proposed in this paper. Firstly, using BIM modeling software to construct a 3D model generates bills of quantities as the basis to obtain the initial research data. Then a mathematical model of time-cost-carbon emissions is constructed with the idea of multi-objective optimization and a double-layer encoding NSGA-II algorithm is designed to solve the optimal set of solutions for the combination of activity execution modes under the premise of satisfying the priority relationship. Finally, a construction project is used as a case to verify the feasibility and rationality of the problem proposed in this paper, and demonstrate that the method can effectively guide the optimization management of the construction process, reduce construction carbon emissions, and promote sustainability of the construction industry.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程BIM and Construction Integration
Resource-Constrained Project Scheduling · Construction Management and Sustainability