Centrifuge Modeling of Underground Tunnel in Saturated Soil Subjected to Internal Blast Loading
Huabei Liu, Soufiane Nezilli
Huazhong University of Science and Technology City College of New York City University of New York
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
A centrifuge test was carried out to investigate the response of transit tunnels in saturated soils under internal blast loading. A similar test with dry soil was conducted beforehand as a comparison. The tests were carried out with a centrifugal acceleration of 50 g to simulate the effect of blast loading from 150-kg trinitrotoluene (TNT) inside a transit tunnel of 5-m diameter. Exploded bridgewire (EBW) charges were employed as the model explosives, and the model tunnel was simulated by thin-wall aluminum tube. The model tunnels were significantly damaged by the projectiles that were part of the EBW charges. Soil liquefaction occurred in saturated soil with 150 kg of TNT exploded at approximately the center of the tunnel.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Geotechnical Engineering and Underground Structures
Structural Response to Dynamic Loads · Blasting Impact and Analysis
参考文献 11
此处列出前 3 条
引用本文 21
按被引量排序,此处列出前 3 条