Simulation-Based Analysis of Tunnel Boring Machine Performance in Tunneling Excavation
Limao Zhang, Xianguo Wu, Miroslaw Jan Skibniewski
University of Alberta Huazhong University of Science and Technology University of Maryland, College Park
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
This paper develops a hybrid simulation approach that integrates a dynamic default tree (DFT) and discrete-time Bayesian network (DTBN) to support tunnel boring machine (TBM) performance prediction and diagnosis. A causal network model consisting of 20 nodes is built to simulate shield cutter head failure over time during the TBM operation. A total of three indicators, namely, T10, T20, and mean time to failure (MTTF), are proposed to transfer the complicated probability distribution into a specific and useful number to explicitly measure the performance level of system unreliability. One of the tunneling projects recently completed in the Wuhan metro system in China has been selected as a case study to verify the applicability of the developed approach. The results indicate that the developed approach is capable of performing not only a feedforward analysis for the estimation of the TBM performance, but also feedback analysis, given that a low performance or failure is observed. This approach provides a powerful potential solution to modeling and analyzing various kinds of system component behaviors and interactions in a complex project environment.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Tunneling and Rock Mechanics
Reliability and Maintenance Optimization · Geotechnical Engineering and Analysis
参考文献 38
此处列出前 3 条
引用本文 18
按被引量排序,此处列出前 3 条