Master Planning of a Semi-Automated Container Terminal
Majid Yavary, Ashebir Jacob, Michael Martin Richter, Larry Nye
Abu Dhabi University Barber-Nichols (United States)
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
This paper will describe the master planning of the semi-automated container terminal (fully automated stacking cranes in the storage yard supported by manually operated horizontal transports) at the Stage 1A greenfield multi-purpose Khalifa Port (KP) which is currently under development by the Abu Dhabi Ports Company (ADPC). KP is located 4.5 km (2.8 miles) offshore of Taweelah, Abu Dhabi, UAE. Issues specifically discussed in this paper include the results of quay crane numerical simulations study that was performed to compare potential productivity of five different quay crane configurations, as well as the development of the spatial layout of the container terminal.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Maritime Ports and Logistics
Marine and Offshore Engineering Studies · Advanced Manufacturing and Logistics Optimization
参考文献 0
引用本文 1
按被引量排序,此处列出前 3 条