Resilience-oriented integrated optimisation of resource allocation and task scheduling in complex manufacturing networks under risk propagation
Zian Zhao, Hong Zhou, Zening Song, Xi Vincent Wang, Jiepeng Wang
Beihang University Marine Design & Research Institute of China KTH Royal Institute of Technology University of Shanghai for Science and Technology
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Uncertainties in manufacturing usually bring about the risk of task failure, which becomes more serious for complex manufacturing service networks (MSN) by cascading effects owing to the complex connectivity and strong interdependence among resources. Hence, the propagation of failure risk throughout the MSN has to be considered in task planning. Typically, resource failures unavoidably lead to the dynamic changes in available capacity, further affect their neighbors, and the effect may propagate throughout the network. So far, fewer investigations on task planning have considered the failure risk propagation among resources. This paper addresses the resource allocation and task scheduling (RATS) considering the propagation of failure risk driven by capacity deterioration/recovery in cloud manufacturing, a typical form of MSNs. A complex-network-based risk propagation and evolution model is first developed to simulate capacity evolution with cascading effects, in identifying and forecasting the risk status of task failure. Then, a resilience-oriented RATS approach is proposed, incorporating flexible scheduling and resilience-enhanced resource grouping to disperse and isolate risk. Three simulation-derived indicators are designed to capture status of risk. A hybrid scatter search algorithm with problem-specific schemes is proposed. Extensive computational experiments and a real-world case have validated the effectiveness and practicality of the proposed method.
逐年被引趋势
暂无年度引用数据
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Scheduling and Optimization Algorithms
Resource-Constrained Project Scheduling · Digital Transformation in Industry
参考文献 39
此处列出前 3 条