Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA
David J. Kelly, Benedict Dozie Ilozor
Wayne State University Eastern Michigan University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
This article presents the results of a quantitative study evaluating relationships between various project outcome metrics and the use of Integrated Project Delivery (IPD). Conflicting results within the literature about these relationships, coupled with significant industry interest, motivated this study. Data from 93 building construction projects were analyzed in a multivariate context controlling for the contribution of covariates unrelated to delivery methods. At the 95% confidence level (CL), significant performance outcomes were not found for IPD projects. Though, at the 90% CL, lower levels of cost and schedule growth were found to be significant for IPD projects when compared to projects completed using other common delivery methods. Also, IPD healthcare projects were found to have significantly fewer Requests for Information (RFI) than non-IPD healthcare projects. Lastly, urban projects showed significantly higher levels of cost and schedule growth, along with increased RFI and punchlist frequency counts, than either suburban or rural projects. Recommendations include exercising caution in the use of IPD as a means to check cost and schedule growth while improving design quality. Project owners should also moderate expectations that IPD is a solution to many of the industry’s problems as postulated by prevalent qualitative and trade literatures.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIConstruction Project Management and Performance
BIM and Construction Integration · Value Engineering and Management
参考文献 21
此处列出前 3 条
引用本文 40
按被引量排序,此处列出前 3 条