On aircraft scheduled maintenance program development
Alireza Ahmadi, Peter Söderholm, Uday Kumar
Luleå University of Technology Swedish Transport Administration
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Purpose The purpose of this paper is to present issues and challenges of scheduled maintenance task development within the maintenance review board (MRB) process, and to find potential areas of improvement in the application of the MSG‐3 methodology for aircraft systems. Design/methodology/approach The issues and challenges as well as potential areas of improvement have been identified through a constructive review that consists of two parts. The first part is a benchmarking between the Maintenance Steering Group (MSG‐3) methodology and other established and documented versions of reliability‐centred maintenance (RCM). This benchmarking focuses on the MSG‐3 methodology and compares it with some RCM standards to identify differences and thereby find ways to facilitate the application of MSG‐3. The second part includes a discussion about methodologies and tools that can support different steps of the MSG‐3 methodology within the framework of the MRB process. Findings The MSG‐3 methodology is closely related to the RCM methodology, in which the anticipated consequences of failure are considered for risk evaluation. However, MSG‐3 considers neither environmental effects of failures nor operational consequences of hidden failures. Furthermore, in MSG‐3, the operational check (failure‐finding inspection) is given priority before all other tasks, whereas in RCM it is considered as a default action, where there is no other applicable and effective option. While RCM allows cost‐effectiveness analysis for all failures that have no safety consequences, MSG‐3 just allows it for failures with economic consequences. A maintenance program that is established through the MRB process fulfils the requirements of continuous airworthiness, but there is no foundation to claim that it is the optimal or the most effective program from an operator's point‐of‐view. The major challenge when striving to achieve a more effective maintenance program within the MRB process is to acquire supporting methodologies and tools for adequate risk analysis, for optimal interval assignments, and for selection of the most effective maintenance task. Originality/value The paper presents a critical review of existing aircraft scheduled maintenance program development methodologies, and demonstrates the differences between MSG‐3 and other RCM methodologies.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Reliability and Maintenance Optimization
Engineering and Test Systems · Aerospace Engineering and Applications