Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach
Runze Yu, Li Ma
Dalian University of Technology
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Purpose The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors. Design/methodology/approach The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors. Findings 12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor. Originality/value There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIConstruction Project Management and Performance
Multi-Criteria Decision Making · Supply Chain Resilience and Risk Management
参考文献 26
此处列出前 3 条
引用本文 33
按被引量排序,此处列出前 3 条