Evaluation of substation configurations and distribution automation with the aid of reliability calculations
Edward Coster, Dirk Boender, Bram Staarink
Eindhoven University of Technology
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
This paper shows the significance of combining optimal HV/MV substation configuration, restructuring distribution network and incorporating remote controlled switching on improving system reliability. A case study is used for the reliability assessment. Stedin decided to install new MV switchgear in HV/MV substations in two redundant sections placed in separate rooms. This decision leads to restructuring of the studied distribution grid, mostly by optimizing the feeding infrastructure of the MV distribution grid. Different substation configurations are assessed, resulting in comparable reliability indices for both the two-sections double busbar and the two-sections single busbar configuration, making the single busbar configuration favorable because this configuration is less expensive. Incorporating these adjustments increases total system reliability and makes distribution grid design more straightforward. Restructuring the MV distribution grid has the largest contribution in increasing system reliability. Final step is including remote controlled switching in the distribution network at the open-points, inside new-build satellite switching stations and at strategic points halfway each feeder. All these improvements reduce system average interruption duration with more than 55% per year for the considered case study.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Power System Reliability and Maintenance
Optimal Power Flow Distribution · Smart Grid and Power Systems