LATE PAYMENT PRACTICES IN THE MALAYSIAN CONSTRUCTION INDUSTRY
Mohd Khairul Anas Mohd Badroldin, Abdul Rahim Abdul Hamid, Syazwani Abdul Raman, Rozana Binti Zakaria, Saeed Reza Mohandes
University of Technology Malaysia
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Factors that influence contractors „cash flow are the frequency of payment, delay, profit margin, retention fund, payment term to the supplier and subcontractor, advanced payment and others. Late payment from the client has become a habit in the construction industry and this practice had caused many implications such as bankruptcy, the higher contract sum due to higher risk, uncomfortable relationship between the payer and payee, disturbance of supply chain and others. The aim of this paper is to examine the late payment practices in the Malaysian construction industry. Thirty seven (37) sets of questionnaire had been collected among the Grade G7 contractors and subcontractors in the state of Selangor based on convenience sampling. The collected data were analysed by using frequency distribution and relative important index (RII). The Data then was tabulated and illustrated in the form of charts. The results of the study show that the late payment is one of the most critical problems in the Malaysian construction industry. The majority of the contractor experienced late payment quite frequently and even beyond the stipulated contract term. The top three impacts of the late payment problems are the negative chain effect on other parties, delay in project completion and lead to bankruptcy or liquidation
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIConstruction Project Management and Performance
Working Capital and Financial Performance · BIM and Construction Integration
参考文献 12
此处列出前 3 条
引用本文 35
按被引量排序,此处列出前 3 条