Estimation of Peak Flood Discharge for an Ungauged River: A Case Study of the Kunur River, West Bengal
Suvendu Roy, Biswaranjan Mistri
University of Kalyani University of Burdwan
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Due to unavailability of sufficient discharge data for many rivers, hydrologists have used indirect methods for deriving flood discharge amount, that is, application of channel geometry and hydrological models, for the estimation of peak discharge in the selected ungauged river basin(s) in their research/project works. This paper has studied the estimation of peak flood discharge of the Kunur River Basin, a major tributary of the Ajay River in the lower Gangetic plain. To achieve this objective, field measurements, GIS technique, and several channel geometry equations are adopted. Three important geomorphic based hydrological models—manning’s equation, kinematic wave parameter (KWP), and SCS curve number (CN) method—have been used for computing peak discharge during the flood season, based on daily rainfall data of September, 2000. Peak discharges, calculated by different given models, are 239.44 m3/s, 204.08 m3/s, and 146.52 m3/s, respectively. The hydrograph has demonstrated the sudden increase with heavy rainfall from the 18th to the 22nd of September, 2000. As a result, a havoc flood condition was generated in the confluence zone of Ajay and Kunur Rivers. This hydrograph might be not only successful application for flood forecasting but also for management of the lower Ajay River Basin as well as the downstream area of Kunur Basin.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
物理Flood Risk Assessment and Management
Hydrology and Watershed Management Studies · Hydrology and Sediment Transport Processes
参考文献 27
此处列出前 3 条
引用本文 36
按被引量排序,此处列出前 3 条