Study on Settlement Influence of Newly Excavated Tunnel Undercrossing Large Diameter Pipeline
Qian Xu, Wenchao Zhang, Cheng Chen, Jun Lu, Peng Tang
Nantong University Soochow University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
With the rapid development of tunnel construction, there will be an increasing number of engineering cases about undercrossing existing pipelines. During the undercrossing process, the settlement control of existing pipelines is relatively strict. If the construction is not handled properly, the existing pipelines will cause a larger settlement, which will affect their normal use. This paper takes an existing pipeline project in Nanjing as the research object and uses numerical simulation to explore the influence of different excavation sequences and grouting reinforcement scopes on the existing pipelines above the newly built tunnels when using shallow tunnel excavation. The results show that the sections are constructed first on both sides of the construction, and the middle section is constructed subsequently, which not only increases the excavation speed but also the pipeline deformation is smaller, especially in controlling the differential settlement on both sides of the pipeline. By studying the relationship between the grouting reinforcement range and the vertical distance from the newly built tunnel to the existing pipeline, it is found that the soil engineering effect within 0.3 d above the arch line is more reasonable, and the feasibility of the proposed scheme is verified through actual monitoring data. This research can provide a reference for similar projects in the future.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Geotechnical Engineering and Analysis
Geotechnical Engineering and Underground Structures · Grouting, Rheology, and Soil Mechanics
参考文献 26
此处列出前 3 条
引用本文 3
按被引量排序,此处列出前 3 条