The cost of anchorage in the sea of Lingdingyang bridge on Shenzhen-Zhongshan link
Jun Mo, Hou-qing Huang
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The Lingdingyang bridge of Shenzhen-Zhongshan Link adopts a (580 + 1666 + 580) meter three-span steel box girder suspension bridge. The East and West anchorages are built in the sea (River), with an offshore distance of about 15 km. The construction of anchorage includes the formation of the land area of the island cofferdam, the construction of a diaphragm wall and foundation, anchor body and anchorage system, etc. The work content, temporary facilities, and construction organization of anchorage in the sea are quite different from those on the land. Based on the study of the construction characteristics and construction organization of the offshore anchorage, this paper analyzes the main aspects of the increased cost of offshore anchorage construction; puts forward the key factors to be considered in the cost compilation of the offshore anchorage, such as the secondary transfer fee of materials and equipment, the use of large ship machinery, construction monitoring, monitoring costs; and put forward opinions on the relevant contract terms and the floating rate of bidding. The research results have important guiding significance for offshore construction or marine (water) engineering construction project approval, investment calculation in the design stage, and cost management during implementation.
逐年被引趋势
暂无年度引用数据
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Civil and Structural Engineering Research
Construction Project Management and Performance · Structural Engineering and Materials Analysis