Stress superposition characteristics and roof structure control of recovery room in close distance coal seam
Zizhao FU, Jianbiao BAI, Shuai YAN, Dong ZHANG, Xiaodong ZHENG, Guangjun SUN, Yongjie WANG
China University of Mining and Technology Xinjiang Institute of Engineering
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The stress disturbance and complex roof situation of the pre excavation recovery room of the close range coal seam group result in severe damage to the surrounding rock of the tunnel during the construction of the recovery room, making it difficult to control the surrounding rock. Taking the 1205 working face recovery room of a certain mine as the background, a mechanical model of the roof of the close range coal seam group recovery room is constructed, the depth of the upper coal seam working face floor failure is estimated, the evolution law of the roof rock fractures of the lower coal seam recovery room is simulated and inverted, the instability mechanism of this type of tunnel is revealed, and a comprehensive stability control technology for surrounding rock is proposed and verified on site engineering. The results show that: By establishing a mechanical model of the roof of the recovery room during the final mining period, it is determined that under the geological conditions of the mine, the support resistance P1≥3.05 MPa in the recovery room can ensure the stability of the surrounding rock of the recovery room after the working face and recovery room are connected; Using empirical formulas optimized by multiple linear and nonlinear regression analysis, it is estimated that the depth of failure of the upper coal seam working face floor is greater than 8.41 m and less than the interlayer spacing of 13.3 m; Using the UDEC numerical calculation model, the evolution law of cracks on the roof of the recovery room was inverted, and reinforcement measures were taken 10 m in advance for the roof of the recovery room under the goaf, and 15 m in advance for the roof of the recovery room under the coal pillar; Propose a comprehensive stability control technology for the combined active and passive support of anchor cables and individual pillars in the recovery room, as well as the advanced pre cracking of the surrounding rock in the inner roof of the coal pillar lower channel, and apply it to different stress affected areas of the recovery room. The monitoring results of mine pressure indicate that during the construction of the recovery room of the working face, the deformation of the surrounding rock is small, the force changes of the anchor rods and cables are small, and the control effect of the surrounding rock is good, ensuring the safe and efficient retreat of the 1205 working face.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Rock Mechanics and Modeling
Coal Properties and Utilization · Geomechanics and Mining Engineering
参考文献 0
引用本文 1
按被引量排序,此处列出前 3 条