Ground Vibration Generated by a Harmonic Load Moving in a Circular Tunnel in a Layered Ground
Xiaozhen Sheng, C.J.C. Jones, David Thompson
University of Southampton
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
All modes of transport impact on e environment. Although railways are seen as environmentally advantageous in many ways, the issues of noise and vibration are often seen as their weakness. For trains running in tunnels where direct airborne noise is effectively screened, structure-borne or ‘ground-borne’ noise caused by vibration propagated through the ground is the most important concern. The vibration of interest in this case has frequency components from about 15 Hz to 200 Hz. To understand the mechanisms of vibration propagation from tunnels, a predictive model has been developed for ground vibration generated by a stationary or moving harmonic load applied in a circular lined or unlined tunnel in a layered ground. This study is the first step towards the use of discrete wavenumber methods to model ground vibration from underground trains. Discrete wavenumber methods fall into three categories: the discrete wavenumber fictitious force method, the discrete wavenumber finite element method and the discrete wavenumber boundary element method. This study uses the discrete wavenumber fictitious force method. Based on the moving Green's functions for a layered half-space and those for a cylinder of infinite length, boundary integral equations over the tunnel-soil interface are established. Unlike the conventional boundary integral equation in elastodynamics, the method used here only requires the displacement Green's function. This is achieved by introducing the excavated part of the ground as an extra substructure. The boundary integral equations are further transformed into a set of algebraic equations by expressing each quantity involved in the boundary integral equations in terms of a Fourier series. Results presented in this paper illustrate the effect of a tunnel on vibration propagation at the ground surface and the difference between a lined tunnel and an unlined tunnel.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Railway Engineering and Dynamics
Geotechnical Engineering and Underground Structures · Civil and Geotechnical Engineering Research
参考文献 21
此处列出前 3 条
引用本文 54
按被引量排序,此处列出前 3 条