Critical-Path Planning and Scheduling: Mathematical Basis
James E. Kelley
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
This paper is concerned with establishing the mathematical basis of the Critical-Path Method—a new tool for planning, scheduling, and coordinating complex engineering-type projects. The essential ingredient of the technique is a mathematical model that incorporates sequence information, durations, and costs for each component of the project. It is a special parametric linear program that, via the primal-dual algorithm, may be solved efficiently by network flow methods. Analysis of the solutions of the model enables operating personnel to answer questions concerning labor needs, budget requirements, procurement and design limitations, the effects of delays, and communication difficulties.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIResource-Constrained Project Scheduling
Optimization and Mathematical Programming · Complexity and Algorithms in Graphs
参考文献 5
此处列出前 3 条
引用本文 902
按被引量排序,此处列出前 3 条