Three-dimensional modelling of a diaphragm wall construction sequence
C.W.W. Ng, W. M. Yan
Hong Kong University of Science and Technology
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
A three-dimensional back-analysis of the construction sequence of three diaphragm wall panels was conducted using the finite difference method. The presence of two stress transfer mechanisms, namely, the horizontal arching and downward load transfer mechanisms during diaphragm wall installation, was confirmed. These two mechanisms act simultaneously and result in an average reduction of horizontal stress directly behind the wall above the toe but an increase of horizontal stress in neighboring soil beyond the wall in the longitudinal direction and below the toe of the wall. The calculated horizontal stress increase beneath the toe by the present analysis is noticeably smaller than the value computed by the pseudo three dimensional analysis.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Geotechnical Engineering and Soil Stabilization
Geotechnical Engineering and Soil Mechanics · Geotechnical Engineering and Analysis