Mark-18A Cold Runs
Anna Bianca, USDOE Office of Environmental Management (EM), USDOE National Nuclear Security Administration (NNSA), Michael Brown, Alan Busby, Peter Fairchild, Kenneth M. Gibbs, Kevin Hera 等 16 位
Savannah River National Laboratory
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIChemical and Environmental Engineering Research
Nuclear and radioactivity studies · Fault Detection and Control Systems