HydroBIM—Digital Design, Intelligent Construction, and Smart Operation
Zongliang Zhang, Sherong Zhang, Zhiyong Zhao, Lei Yan, Chao Wang, Han Liu
PowerChina (China) Tianjin University Yunnan Water Conservancy and Hydropower Survey and Design Institute
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Improving the design efficiency of hydropower hub buildings and promoting the application of intelligence in engineering construction and operation management have been critical issues in hydropower engineering construction. The major challenges are mainly reflected in the difficulties of multidisciplinary collaboration and the inefficient coordination of work involving multiple parties. This paper proposes a building information modeling (BIM)-based technology system architecture for digital design, intelligent construction, and intelligent operation, which combines BIM technology with geographic information system (GIS), computer aided engineering (CAE), internet of things (IoT), artificial intelligence (AI), and other technologies. The proposed system includes a BIM-based multiprofessional forward collaborative design method, a BIM-based engineering construction management model, and a real-time safety analysis and evaluation technology system based on actual measured safety information and construction. The hydroelectrical engineering BIM (HydroBIM) comprehensive control platform is developed. In the planning and design stage, the platform enables the whole process and full-professional collaborative digital design. In the engineering construction management stage, it supports the whole process and all-round information management and control of contract, schedule, quality, safety, and investment. In the operation management stage, the platform facilitates the integrated management of engineering safety evaluation, early warning, and emergency plan based on monitoring data and the consistency criterion of positive and negative evaluation. The application of this technology in more than 20 engineering, has proven to improve the efficiency of design and analysis of hydropower hub buildings and the intelligence level of engineering construction and operation management, and overcome the difficulties of multi-professional collaboration in the design stage and low efficiency of multi-participant coordination in the construction stage.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Infrastructure Maintenance and Monitoring
Underground infrastructure and sustainability · 3D Surveying and Cultural Heritage
参考文献 20
此处列出前 3 条
引用本文 31
按被引量排序,此处列出前 3 条