A Stacking Heterogeneous Ensemble Learning Method for the Prediction of Building Construction Project Costs
U-Yeol Park, Yunho Kang, Haneul Lee, Seok-Heon Yun
Gyeongguk National University Gyeongsang National University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The accurate cost estimation of a construction project in the early stage plays a very important role in successfully completing the project. In the initial stage of construction, when the information necessary to predict construction cost is insufficient, a machine learning model using past data can be an alternative. We suggest a two-level stacking heterogeneous ensemble algorithm combining RF, SVM and CatBoosting. In the step of training the base learner, the optimal hyperparameter values of the base learners were determined using Bayesian optimization with cross-validation. Cost information data disclosed by the Public Procurement Service in South Korea are used to evaluate ML algorithms and the proposed stacking-based ensemble model. According to the analysis results, the two-level stacking ensemble model showed better performance than the individual ensemble models.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程BIM and Construction Integration
Infrastructure Maintenance and Monitoring
参考文献 34
此处列出前 3 条
引用本文 56
按被引量排序,此处列出前 3 条