BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study
Heap‐Yih Chong, Xinyi Yang, Cheng Siew Goh, Yan Luo
Nanjing Audit University Northumbria University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Traditional project scheduling tools like Gantt charts struggle with dynamic adjustments and real-time optimization in complex construction projects, leading to inefficiencies and delays. This study addresses this challenge by proposing a dynamic optimization framework that integrates Building Information Modeling (BIM) and Artificial Intelligence (AI) to enhance schedule management. The framework comprises three layers: a data layer for collecting BIM and real-time site data, an analysis layer powered by AI algorithms for predictive analytics and optimization, and an application layer for visualizing progress and supporting decision-making. Through a case study on a large-scale water reservoir tunnel project in China, the framework demonstrated significant improvements in identifying schedule risks, optimizing resource allocation, and enabling real-time adjustments. Key innovations include a 4-in-1 Network Diagram Engine and a Blueprint Engine, which facilitate intuitive progress monitoring and automated task management. However, limitations in personnel skill matching, interface complexity, and mobile system performance were identified. This research advances the theoretical foundation of BIM-AI integration and provides practical insights for improving scheduling efficiency and project outcomes in the construction industry. Future work should focus on enhancing human resource management modules and refining system usability for broader adoption.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程BIM and Construction Integration
Advanced Manufacturing and Logistics Optimization · Manufacturing Process and Optimization
参考文献 49
此处列出前 3 条
引用本文 22
按被引量排序,此处列出前 3 条