Medium- and Long-Term Power System Planning Method Based on Source-Load Uncertainty Modeling
Wenfeng Yao, Ziyu Huo, Jin Zou, Wu Chen, Jiayang Wang, Xiang Wang, Siyu Lu, Yigong Xie 等 13 位
China Southern Power Grid (China) Tsinghua University Yunnan Power Grid Co., Ltd. (China)
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
In order to consider the impact of source-load uncertainty on traditional power system planning methods, a medium- and long-term optimization planning method based on source-load uncertainty modeling and time-series production simulation is proposed. First, a new energy output probability model is developed using non-parametric kernel density estimation, and the spatial correlation of the new energy output is described using pair-copula theory to model the uncertainty analysis of the new energy output. Secondly, a large number of source-load scenarios are generated using the Markov chain Monte Carlo simulation method, and the optimal selection method for discrete state numbers is provided, and then the scenario reduction is carried out using the fast forward elimination technology. Finally, the typical time-series curves of the source-load uncertainty characteristics obtained are incorporated into the optimization planning method together with various flexible resources, such as the demand-side response and energy storage, and the rationality of the planning scheme is judged and optimized based on key indicators such as the cost, wind–light abandonment rate, and loss-of-load rate. Based on the above methods, this paper offers an example of the power supply planning scheme for a certain region in the next 30 years, providing effective guidance for the development of new energy in the region.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程Power System Reliability and Maintenance
High-Voltage Power Transmission Systems · Power Systems and Renewable Energy
参考文献 21
此处列出前 3 条
引用本文 11
按被引量排序,此处列出前 3 条