Seepage and Groundwater Numerical Modelling for Managing Waterlogging in the Vicinity of the Trimmu–Sidhnai Link Canal
Muhammad Aslam, Muhammad Umer Shehzad, Ahsan Ali, Nazam Ali, Krisada Chaiyasan, Husnain Tahir, Panuwat Joyklad, Qudeer Hussain
University of Lahore University of Management and Technology Thammasat University National Engineering and Scientific Commission
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
The present study focused on the development and application of two computer numerical models, namely, a seepage model developed using SEEP/W software and a groundwater model developed using Visual MODFLOW software. The seepage model was applied to a 38 km length of the tail reach of the Trimmu–Sidhnai (T-S) link canal passing through a severely waterlogged area of 32,000 ha, with a water table within 0–1.5 m from the ground surface; this was to quantify the canal seepage under the present condition (without any intervention) and with the interventions of a concrete lining of the complete prism of the T-S link canal and concrete side protection of the T-S link canal, with the canal bed unlined. The groundwater model evaluated the effectiveness of three waterlogging management interventions, which included: (i) the rehabilitation of the 43 existing drainage tube wells, (ii) the rehabilitation of the existing surface drains, and (iii) a combination of the rehabilitation of the 43 existing drainage tube wells and the rehabilitation of the existing surface drains. The seepage modeling revealed that the concrete lining intervention can reduce 50% of the seepage of the T-S link canal, whereas the concrete side protection intervention can reduce only 21% of the canal seepage. The groundwater modeling revealed that the waterlogging management intervention of the rehabilitation of the 43 drainage tube wells and surface drains can lower the groundwater level from 139.2 to 138.3 m (0.9 m drop), resulting in the mitigation of waterlogging in 45% (14,400 ha) of the severely waterlogged area. The present study recommends that complete concrete lining of the T-S link canal has a huge potential to reduce seepage from the canal, and the combination of the rehabilitation of the 43 drainage tube wells and surface drains also offers a great potential for controlling waterlogging. This intervention can also be considered to mitigate waterlogging from the severely waterlogged area. Cost-effectiveness analysis of the concrete lining of the T-S link canal, the rehabilitation of the 43 existing drainage tube wells, and the rehabilitation of the existing surface drains need to be performed for decision-making and selection of the most cost-effective intervention for implementation. A study needs to be conducted for the development and evaluation of economical and socio-technically feasible and acceptable preventive waterlogging management interventions, including the improved management of irrigation systems, improved irrigation management practices at the farm, improved conjunctive management of surface and groundwater, and improved management of drainage systems at the primary, secondary, and tertiary canal command levels.
逐年被引趋势
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
物理Hydrology and Watershed Management Studies
Groundwater flow and contamination studies · Groundwater and Watershed Analysis
参考文献 29
此处列出前 3 条
引用本文 9
按被引量排序,此处列出前 3 条