Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building)
Muhammad Reza Nur Fadlilah, Fajar Sri Handayani, Muji Rifai
Sebelas Maret University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Quantity Take Off (QTO) is in important process in the construction industry that calculates and estimates the amount of material needed to complete a construction project. This process includes detail analysis of design plans and technical specification to identify and calculate quantities. QTO results are used to create cost budgets, create project plans, and plan material procurement. This research explains the Building Information Modeling (BIM) application which uses Autodesk Revit software to calculate Quantity Take Off volume. The aim is to find out the difference between volume calculations using conventional methods and volume calculations using the BIM method and Quantity Take Off volumes in architectural work and structural work. A comparative analysis of conventional methods and the use of Autodesk Revit provide an overview of the efficiency and effectiveness of implementing BIM software in the Bantul Satpol PP Building Construction Project with a focus on structural an architectural work investigation studies. This research uses a case study methodology which includes a quantity survey using Building Information Modeling (BIM) techniques using Autodesk Revit and Microsoft Excel software. This research method includes preparatory steps, data collection techniques, 3D modeling, and data analysis based on volume the use of BIM software and conventional methods. Based on the survey results, the difference in volume calculations for architectural work is 9,68% and for structural work is 9,00%, this shows that volume calculations using the BIM method are smaller than using conventional methods.
逐年被引趋势
暂无年度引用数据
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
工程BIM and Construction Integration
Construction Project Management and Performance · Architecture and Computational Design
参考文献 19
此处列出前 3 条