Uncertainty-Aware Construction of Semantic Scheduling Instances from Incomplete Software Artifacts
Dmytro Tyshchenko, Viktoriia Antypenko, Анна Вікторівна Марченко, Svitlana Vashchenko
Sumy State University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Small software teams without a dedicated project manager repeatedly determine task assignments, execution sequences, and schedules from noisy and incomplete process artifacts. Existing multi-skill project scheduling methods assume an already-verified scheduling instance; however, in this setting, the main challenge is constructing that instance. This study formulates semantic scheduling as an uncertainty-aware framework that builds an admissible, quality-controlled scheduling instance from incomplete artifacts and optimizes it into feasible calendar-resource schedules. A Large Language Model (LLM) structures raw artifacts under a canonical vocabulary gate and Human-in-the-Loop (HITL) review; the surviving competences become continuous eligibility thresholds; a Machine Learning (ML) execution-time prior, trained under a leakage-controlled temporal split of a public issue corpus, is incorporated as a bounded relative multiplier; and a standard Genetic Algorithm (GA) optimizes a calendar-aware Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP). The language model does not participate in scheduling decisions. Skill extraction achieved an F1-score of approximately 0.65 against reference labels, with inter-annotator agreement of approximately 0.66 (Cohen's kappa ) from an independent blind annotator. The public-corpus prior achieved a median of 20% of assignments. On a retrospective replay of an anonymized industrial project of 656 tasks and six developers, a same-project effort prior changed the modeled median makespan from 86.9 to 72.2 days, whereas semantic competence thresholds trade makespan and load balance for assignments closer to the historical team, increasing agreement from 0.28 to 0.35. These results demonstrate feasibility and measured decision shift, not improved delivery outcomes or cross-organizational generality.
逐年被引趋势
暂无年度引用数据
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AISoftware Engineering Techniques and Practices
Resource-Constrained Project Scheduling · Software Engineering Research
参考文献 23
此处列出前 3 条