Construction Schedule Prediction for Condominium Projects in Addis Ababa: A Comparative Analysis of Random Forest and Alternative Approaches
Kassahun Jima Kaba, Mohammadzen Hasan Darsa, Moh Nur Sholeh
Dire Dawa University Diponegoro University
阅读操作
确认中在文库中上传 PDF 后可生成中文音频讲解。
摘要与影响
Accurate construction duration estimation is critical for scheduling and resource allocation, yet traditional heuristic techniques often result in severe schedule overruns. This vulnerability is highly evident in Addis Ababa’s public housing sector (20/80 and 40/60 condominium schemes), where over 38,000 units face chronic multi-fold delays due to data deficiencies and rigid planning tools. To establish a robust context-specific duration prediction model, this study utilizes historical data spanning 2013 to 2023 from 595 building blocks compiled by the Addis Ababa Housing Development and Administration Bureau (AAHDB) to develop an interpretable, Python-based machine learning model. A hybrid feature selection pipeline consisting of embedded feature selection and correlation matrix analysis optimized twelve initial variables into a highly relevant seven-predictor framework, integrating key physical building attributes with operational and seasonal metrics. Four machine learning algorithms were benchmarked to evaluate predictive performance: Random Forest (RF), Support Vector Machine (SVM), Linear Regression (LR), and an Artificial Neural Network (ANN). The empirical results established a definitive performance hierarchy: Random Forest > Support Vector Machine > Multiple Linear Regression > Artificial Neural Network. The primary Random Forest model achieved exceptional predictive dependability, yielding a coefficient of determination R² of 0.999, paired with minimal error margins (RMSE = 0.081 months and MAE = 0.015 months). The non-linear SVM baseline served as the closest competitor, capturing complex multidimensional patterns with an R² of 0.976 (RMSE = 1.09 months), whereas traditional linear regression (R² = 0.822) and the data-constrained ANN (R² = 0.665) underperformed. Given the high predictive accuracy of the ensemble tree and kernel models, independent k-fold cross-validation is recommended before implementation. Ultimately, this research resolves historical ‘black-box’ rasping by balancing model interpretability with data-driven precision, offering public planners and construction practitioners an effective management tool to mitigate local housing project delays.
逐年被引趋势
暂无年度引用数据
关键指标
同类平均 = 1
同领域 · 同年份 · 同类型
Google Scholar 与 OpenAlex 的被引统计范围不同,数值存在差异属正常。
AI 辅助阅读
依据:摘要
可就本文提问;依据不足时会说明。
学术脉络
学科主题
计算机 / AIConstruction Project Management and Performance
BIM and Construction Integration · Resource-Constrained Project Scheduling